The development of the ASG

A look back at the history of the ASG's development.

2021

ASG GmbH becomes ASG AG

On 26.01.2021, ASG GmbH was transferred to a public limited company.

2021

2019

Construction of a pressure distillation plant

Installation of a continuous pressure distillation plant up to a maximum pressure of 16 bar

2018

Oxymethylene ether (OME) as diesel fuel

Master thesis on the development of an oxymethylene ether (OME) operated diesel engine motorcycle.

2018

2017

Expansion of technical center

Installation of the first continuous distillation plant

2015

Expansion of the fuel storage facility

Commissioning of the new hall with pilot building and fuel storage

2015

2013

Expansion of ASG

Inauguration of the new 2nd floor with office and training rooms

2006

Building extension

Construction of a small technical center

2006

2003

Construction of a laboratory building

Move into our newly built laboratory building

2001

Enlargement

Move to a larger building in Augsburg

2001

1999

DWS Synthesetechnik GmbH

Foundation of the sister company DWS Synthesetechnik

1998

Accreditation

Accreditation by DASMIN (German Accreditation Body for Mineral Oil)

1998

1993

Relocation

Relocation to the Neusäss/Augsburg location

1992

Business start-up

Foundation of ASG as a GmbH at Pöttmes/Echsheim

1992